BALTIMORE, MD Span Systems completed the major portion of the structural refurbishment of Baltimore's popular Pier Six Pavilion and the facility opened for its summer concert season on June 2, 2018. The project involved a complete engineering review and partial redesign of the 20-year-old waterfront performance venue. A new architectural fabric system was designed and installed - including a partial liner designed to improve acoustic performance.